New Photos: Rail Crossing Dates: 7/12/04-7/13/04 Kent, CT: CAMA's narrow gauge railroad tracks extend southward. Here are some new photos provided by CAMA member Mike Piersa. |
|
|
| ABOVE: CAMA volunteer Jim Daly helps align the rail ends as a new rail is moved into position. |
ABOVE: Rail being lifted into position. |
|
|
| ABOVE: Using a trackjack and the track gauge tool to adjust the track gauge to 3 feet at the joint between the existing track and the new extension. |
ABOVE: A good shot of the combined CAMA/Housatonic RR crew gauging and spiking the 110 lb. rail in the crossing. |
|
|
| ABOVE: Immobilizing the finished track with stone ballast. |
ABOVE: CAMA/Housatonic RR track crew. |